Skills & Craft

    How to Make a Tech Pack a Factory Will Actually Follow

    By Shreyas Srivastava | Director, EIF

    July 28, 2026 · 7 min read

    Share:

    A tech pack is a contract written in drawings and numbers. When it is clear, sampling is quick and cheap. When it is vague, the factory guesses — and you pay for the guess.

    The pages every tech pack needs

    Cover sheet

    Style number, season, category, fit block, sample size, date, version.

    Technical flats

    Front, back and any detail zoom, all to the same scale.

    Measurement chart

    Points of measure with tolerance, graded across your size set.

    Bill of materials

    Every fabric, trim, label and thread with supplier, colour and consumption.

    Construction notes

    Stitch type, SPI, seam finish, topstitch distance, pressing.

    Labels and packing

    Placement, care content, folding, polybag and carton details.

    Printed tech pack pages laid out for review
    One sheet per subject. No mixed information.

    The mistakes that cause sampling delays

    Flats without a back view. Measurements without tolerance. A BOM missing the thread colour. Two different style numbers on two pages. Notes in paragraphs instead of short instruction lines. Every one of these produces a phone call, and every phone call costs a day.

    Version control saves relationships

    Date every revision and note what changed at the top. When a sample comes back wrong, the version history tells you immediately whether the factory misread or you never sent the change. This one habit prevents most disputes.

    A sampling room referring to printed documents
    The pack on the factory table decides what gets made.

    Doing it faster in 2026

    Digital garment files and AI-assisted drafting now generate flats, a measurement skeleton and a first BOM in a fraction of the time, leaving you to do the judgement work. The standard has not changed — the speed has.